Project Details
CountrySouth Korea
LocationGyeonggi
Terminal TypeRegasification (Import)
Rig TypeOnshore
Capacity41 mtpa / 55.8 bcm
Trains-
Start Date01-Jan-1986
Cost (US$bn)-
OriginNigeria, Peru, Qatar
Destination-
OwnersKorea Gas (Kogas) [Operator] {South Korea}
Buyers-
Status Notes
June 2023 - The terminal is operated by Korea Gas (Kogas); July 2022 - A hydrogen production facility has been built in Pyeongtaek, because hydrogen is being produced here from natural gas pyrolysis at the terminal
Last reviewed: 04 Aug 2023